Posts Tagged ‘Rebuild’
A new toy spelt TORTURE!! – Part Two
Well the freezing weather and wind kept the working speed slow but the plastics are close to ready to undercoat.
The previous entry showed the upper fairing half missing the indicator mounts and a thin section which thanks to Tupperware, has now been replaced. Why Tupperware? Well I was looking for something that would be fairly solid but flexible at the same time. I spied an old container that the boss used for feeding the birds sitting on the BBQ – it didn’t take me too long to see that the rolled edge was oh so close to what was needed, all it required was a tiny bit of modifying as you can see from the photos.





